Editorial Performing Under Pressure An EPA consent decree with DeKalb County, Ga., has made accelerated infrastructure mapping a critical goal. July 30, 2013
Editorial Leak-testing Laboratory Henry County puts leak detection systems to the test and makes big strides in reducing water loss. July 30, 2013
Editorial Ears Peeled for Trouble Baltimore officials use fiber optics to hear problems in water mains before they lead to catastrophic failures. July 30, 2013
Editorial ICGA Past, Present and Future NASSCO’s divisions help support and promote specific trenchless technologies. July 30, 2013
Editorial The Problems of the Day Solving the issues that plague your system is an ongoing battle, and it’s all part of the job. July 30, 2013
Editorial Control in the Corners RapidView IBAK rolls out POLARIS lateral inspection camera at 2013 Expo. July 30, 2013
Editorial Defuse Difficult Employees Reining in the drama queens, complainers, bullies and slackers who seem to inhabit every workplace requires the proper approach. July 30, 2013
Editorial In the Groove Coupling options and quick installation give grooved pipe a flexible advantage for many projects. June 27, 2013
Editorial Root Force Knoxville Utilities Board combines accelerated system upgrades with a comprehensive maintenance program that includes effective root control. June 27, 2013
Editorial A System for Clean Sewers Dallas drastically reduces FOG blockages by tracking compliance with collection requirements through simple manifests. June 27, 2013
Editorial Holistic Approach Lynchburg, Va., tackles significant overflow issues by taking on the easiest work first, then developing a cost-saving plan to deal with the toughest jobs. June 27, 2013