The East Bay Municipal Utility District has long been a national leader in pipeline innovation, and now it's pioneering water infrastructure projects that could mitigate the impact of seismic events in the region
Hurricanes, floods and power outages happen, and when they do they can have a devastating impact on your operations
Outsmart water anytime, anywhere, with the Godwin S Series pumps
Savvy trenchless team uses powered sliplining technique to renovate failing sanitary line over icy river
Heat deflection temperature is one factor to consider when making the determination
Equipment training is critical to adjusting to new sewer rehabilitation equipment and provides a level of insurance
Choosing the right sewer rehabilitation method for a given job requires thinking about various pipeline attributes
Quick-Lock requires no chemicals, resins or glues and is suitable for all forms of pipe and surfaces. Simplify your rehabilitation needs with Quick-Lock.
With nearly half a century of history in the United States, cured-in-place pipe materials and processes have evolved significantly over the years
Officials at Madison (Wisconsin) Water Utility deal with a worst-case scenario when a crucial water main breaks directly below the taxiway of Dane County Regional Airport
City, contractor and engineer work together to find a better solution for force main project.
Roadside workers need to have their attention on the hazards of the job
Elizabethton, Tennessee, has seen cost savings since merging its water and wastewater divisions into a single entity, allowing it to tackle overdue rehabilitation projects
For municipalities in cold-weather climates, winter will be here soon. From adjusting CIPP lining practices to winterizing jetters, here are some tips to keep in mind.