Construction, financing, permitting and civil design work can be as high as 75% of the total cost to install new equipment. Tearing down and rebuilding new structures to fit new equipment is often unavoidable. When possible, reusing and repurposing existing structures leads to significant overall project savings. Oldcastle Infrastructure’s HeadCell grit separation technology has been engineered by Hydro International to maximize the flexibility of installation options.
The stacked tray design is modular, a variety of tray diameters and the number of trays can be changed to meet many existing tank configurations. Multiple stacks of trays can be provided to get the same outstanding level of performance customers expect from HeadCell Advanced Grit Separation. Contact Oldcastle today to discuss your project parameters and to see if the flexible design of the HeadCell is the right fit for your site constraints.