Loading...
This content is sponsored by Crane Pumps. Sponsored content is authorized by the client and does not necessarily reflect the views of COLE Publishing. View our privacy policy.

Will Sheffer, lead pump station mechanic for South Burlington Wastewater, talks through the decision to upgrade the Hinesburg Road lift station’s pumps. After a period of removing about a yard of material per month, it was time to upgrade. After seeing a demo of the envie3 air-filled chopper pumps, the decision was easy. And then it was a no-brainer for Sheffer to upgrade the rest as well.

Learn more


Screen Shot 2020 08 26 at 9 38 24 AM
Next ›› SEEPEX Progressive Cavity Pumps 101

Related